Projects

Pv Plant

imagenes

See images

imagenes

Download File

The photovoltaic plant, with an installed capacity of 100 MW, will have 392,000 solar panels that capture the energy from the sun to deliver it directly to the grid.

Name Cerro Dominador Pv
Location María Elena, región de Antofagasta
Tecnhology Photovoltaic
Reduction of emission 230 mill ton Co
Constructor Abengoa
Investment USD 300 MM
Sponsor EIG Global Energy Partners

The solar thermal plant

imagenes

See images

imagenes

Download File

The solar thermal plant will have 10,600 heliostats in a solar field that will cover more than 700 hectares. Heliostats concentrate solar radiation at a single point, the receiver, located at the top of a 820 feet high tower. Radiation coming from the sun is used to heat molten salts. The molten salts generate the steam necessary to power a 110 MW turbine, which generates clean electricity. The plant will also feature a thermal storage system with molten salts that will permit to deliver stable energy 24 hours a day.

Name CSP Plant Cerro Dominador
Location María Elena, región de Antofagasta
Technology CSP
Emissions Plant prevent de emission of 640 mil ton of Co2
Constructor Consorcio Acciona Abengoa
Investment USD 1000 mill
Sponsor EIG Global Energy Partners